---
title: "Migrate Clients, Projects and Estimates to Design Software"
date: 2026-11-18
lang: en
url: https://archiboard.design/blog/migrate-clients-projects-estimates-design-software
---

# Migrate Clients, Projects and Estimates to Design Software

To migrate clients, projects and estimates to interior design software, move only active projects first, clean each estimate into one consistent table, and import a single pilot project before the rest. Closed projects stay in an archive and are not rebuilt line by line. Before you stop using the old files, check totals, rooms, suppliers and open payments against the original.

## Decide what to migrate and what to archive

The most common reason a migration stalls is the attempt to move everything. Years of old files contain duplicate suppliers, abandoned versions and projects that no one will open again. Moving them costs time and brings the mess into the new system. Start by sorting your data by how much it affects work in the next few months.

| Data | Migrate? | How | Note |
| --- | --- | --- | --- |
| Active projects with open procurement | Yes, fully | Project, rooms, estimate, team | These are the reason to switch |
| Estimates of active projects | Yes | Import from a spreadsheet or PDF | Use the latest approved version, not every draft |
| Supplier and contractor contacts | Yes, cleaned | Only suppliers you still use | Merge duplicates before moving |
| Client contact details | Yes, per project | Enter with the project | Only for current clients |
| Advances, balances, payment dates | Yes, for open items | Record as payments on items | For closed items a summary is enough |
| Invoices, receipts, supplier quotes | Yes, for open items | Attach to items or project files | Keep the rest in the archive |
| Completed projects | No, archive | Export final files to a folder | Rebuild only if you plan a repeat order |
| Email and messenger threads | No | Write down decisions that still matter | Approvals belong in the project, not in an inbox |
| Old price lists and templates | Selectively | Keep items you reuse often | Do not import outdated prices |

### A simple cut-off rule

If a project has at least one item that is not yet delivered and accepted, or at least one unpaid balance, it is active and gets migrated. Everything else stays in the archive with a clear folder name. This rule is easy to apply to a long list of projects and keeps the scope small.

## Prepare your data before importing

Import quality depends on how consistent the source file is. An hour of cleanup before the import saves several hours of corrections afterwards. A ready [estimate template](/tools/estimate-template) can serve as a target layout if your current files differ from project to project.

1. **List active projects.** Write one line per project: client, city, current stage, number of rooms, estimate version that counts.
2. **Pick one estimate layout.** Use the same column order in all files you plan to import. Name, quantity, unit, price, currency, room, supplier and product link are enough.
3. **One row per item.** Remove merged cells, subtotals inside the data and notes typed into number columns. Keep totals at the bottom or remove them.
4. **Mark rooms with section headings.** A heading such as "Kitchen" above its rows is easier to interpret than a room name repeated in every cell.
5. **Separate money from the estimate.** Keep a short list of what was paid to each supplier: advance, balance, dates. Do not mix it into the price columns.
6. **Gather documents by project.** Put invoices, receipts and supplier quotes for active items into one folder per project.
7. **Clean the supplier list.** Merge duplicates such as "Nordic Home" and "Nordic Home Ltd", and delete suppliers you have not ordered from in a long time.

### Pre-import checklist

- The estimate total in the file matches the last version the client approved.
- Every row has a quantity and a unit of measurement.
- Prices have one currency per row, and the currency is stated.
- Product links open and point to the exact product, not to a catalog page.
- Optional items are marked, so they can be excluded from the total.
- Items bought for several rooms are written once, with the split noted.
- Dimensions are in a separate column or in the description, not only in a photo.
- The file is accessible: an online spreadsheet opens by link, a PDF is not password protected.

If your starting point is a set of spreadsheets, the step-by-step [guide to migrating from spreadsheets](/help/how-to/migrate-from-spreadsheets) covers the same preparation in more detail.

## Run a pilot project, then move the rest

Do not import all projects on the first day. One pilot project shows how your files behave in the new system and which cleanup rules you need to add. Choose a project of medium size that is already in procurement, so that statuses, suppliers and payments are all present.

1. **Create the project** with the same name, city and roles as in your old file.
2. **Import the estimate** and review how columns were interpreted.
3. **Compare totals** by room and for the whole estimate with the source.
4. **Add the open payments** and attach documents for items that are ordered but not delivered.
5. **Invite the team** and ask each person to find their own tasks and items.
6. **Decide** whether the layout rules need changes, then apply them to the next batch.

After the pilot, move the remaining active projects in batches of two or three. A small batch is easy to verify and easy to fix.

### What to verify after each import

- Room totals and the grand total match the source.
- The number of rows matches, apart from rows you deliberately removed.
- Items bought for several rooms appear once, with the correct share per room.
- Photos and dimensions are attached to the right rows.
- Links work, and dead links are listed so you can replace them.
- Optional items are excluded from the total.
- Item statuses reflect reality: what is ordered, in transit or delivered.
- Advances and balances match your payment list.

### One source of truth per project

Once a project is migrated, mark the old file as read-only and rename it, for example with "archived" at the start. Editing both versions in parallel is how totals drift apart. If you need a transition period, set a fixed end date and tell the team.

## Common mistakes during migration

- **Importing every draft.** Three versions of one estimate create confusion. Import the version that counts.
- **Moving old projects first.** They add work and no value. Active projects come first.
- **Skipping the payment history.** If advances are not recorded, the system cannot show what is still owed to suppliers, and the first balance payment is missed or paid twice.
- **Ignoring currency.** If prices are in several currencies, state the currency per row. A single unmarked column leads to wrong totals.
- **Leaving rooms unassigned.** Items without a room are hard to budget and to export for a client by room.
- **Not telling the team.** If a colleague keeps updating the old file, you will find two truths a week later.
- **Trusting the import without a check.** Compare totals every time, even when the result looks right.

## How to do it in ArchiBoard

ArchiBoard is built for moving a ready estimate from a spreadsheet in minutes instead of retyping it. See how it compares in [ArchiBoard vs. spreadsheets](/compare/excel-google-sheets), and read the [estimate import help chapter](/help/estimate-import) for the details of every step.

1. Register and open the "Demo project" in your account to see the structure. It does not count toward the free plan limit, and you can delete it later.
2. On Home, click "New Project". Enter the name, the city and your studio's role. City and country are used to calculate delivery times and currency.
3. Open Team and click "Invite member". Add the email and role of each colleague. Client, contractor and supplier contacts are also stored here.
4. Go to Estimates and click "Import". Upload a spreadsheet, CSV or PDF file, or paste a link to an online spreadsheet that is accessible by link.
5. Check what each column means (name, quantity, price and so on). The system usually detects this itself.
6. Choose a room to import into, or keep the breakdown from the file, and click "Import". Sections of the estimate become rooms, and an item bought for several rooms is stored as one row with a share per room.
7. Review the result. Items without a room are collected in the "No room" block and can be distributed among rooms. Dead links are marked, and "Optional" items are not included in the total.
8. For a supplier quote, use "Import", enable "This is a supplier quote" and fill in "Quote no." and "Quote date".
9. For invoices and receipts, open Estimates, click "Receipts & quotes", add files with "Choose files" or "Choose folder", check the suggested items and amounts, and click "Apply". Nothing changes until you apply.
10. For payments, open "Vendor & payment" in the item row. Under "Supplier payment", check "This is an advance" if you pay in parts. Add a supplier with "+ Add contractor" if it is not in the list.
11. If something went wrong, open Activity Feed and click "Undo import" to revert the whole import.

## FAQ

### How long does it take to move to new interior design software?

Importing a clean estimate takes minutes. Most of the time goes into preparation: choosing active projects, fixing the file layout and collecting payment data. A studio with a few active projects can finish after a pilot and one or two batches. The exact time depends on how consistent your files are.

### Should I migrate completed projects?

Usually not. Completed projects have no open procurement or payments, so rebuilding them gives little value. Save the final estimate, invoices and drawings into an archive folder. Migrate a completed project only if you expect a repeat order, a warranty claim or a follow-up phase.

### Can I import an estimate with photos and items used in several rooms?

Yes. In ArchiBoard, photos placed in spreadsheet cells are moved to the matching rows. An item written for several rooms, for example "Kitchen 2, Bedroom 1", is stored as one row with a share and total for each room. Check the room split after import, because it affects room budgets.

### What happens if the import contains mistakes?

Check totals and room splits right after the import. If the result is wrong, open the Activity Feed and click "Undo import" to revert the entire import. Then fix the source file, for example merged cells or mixed currencies, and import again. Cleaning the source is faster than correcting rows one by one.

### How do I move my supplier contacts?

Clean the list first and keep only suppliers you still order from. A supplier is added automatically when you save a product from its website, and the system tries to find contacts there. You can also add one through "+ Add contractor" in "Vendor & payment". Your suppliers are visible only to you and your team.

### Can I test the migration for free before moving everything?

Yes. The Free plan allows up to 20 items and 2 participants, which is enough to test an import on a small estimate. The demo project in your account does not count toward that limit. Use a small project or a part of an estimate to check how your files behave before you decide.
