How to Price Interior Design Services: Fixed, Per m² or Hourly
· 8 min read
To price interior design services, first calculate what one billable hour costs your studio. Then estimate the hours each project stage needs, and choose how to present the result: a fixed fee, a rate per square metre or an hourly rate. Most studios end up with a fixed fee built from hours and checked against a per-square-metre figure. This article shows how to build that number and how to protect it with a clear scope.
Compare the three pricing models
Each model answers a different question. A fixed fee answers "what will the whole project cost?". A per-square-metre rate answers "how do I quote quickly?". An hourly rate answers "how do I get paid when the scope is unclear?".
| Model | How the price is formed | Works best for | Main risk |
|---|---|---|---|
| Fixed fee | Estimated hours by stage, plus a buffer for revisions | Projects with a defined scope and a clear brief | Underestimated hours, scope creep |
| Per square metre | Rate multiplied by area, with a different rate per service level | First quotes, apartments and standard layouts | Ignores complexity: a small bathroom costs more work per m² than a bedroom |
| Hourly | Tracked hours multiplied by a rate | Consultations, small tasks, unclear or changing scope | The client cannot predict the total and may resist it |
Fixed fee
Clients like a fixed fee because the total is known before work starts. It also rewards you for working efficiently. The price is only as good as your hour estimate, so build it from stages, not from a gut feeling.
Per square metre
A rate per square metre is fast to communicate, which is why many clients ask for it. Treat it as a result, not as the starting point. Calculate the fee from hours first, divide it by the area, and keep that figure as a benchmark for future quotes. If you work in square feet, the logic is the same.
Hourly
Hourly billing is the most honest model when nobody knows the scope yet. Use it for site consultations, concept workshops and extra work outside the contract. For a full project, many clients read an hourly rate as an open-ended bill.
Percentage of project budget
Some studios charge a percentage of the construction and furnishing budget. It scales with project size, but your effort does not always grow with the budget: a cheap project with many custom details takes longer than an expensive one with few items. If you use it, set a minimum fee.
Build the price step by step
- Calculate your cost per billable hour. Add the pay you want to take home and the yearly studio costs (software, rent, insurance, accounting). Add a profit margin. Divide by the hours you can realistically bill, which is far fewer than the hours you work.
- List the project stages. Typical stages are brief and survey, layout, concept and visuals, technical drawings, specification and estimate, procurement support, and site visits.
- Estimate hours per stage. Use your past projects as a reference. If you do not track time yet, start now; after three projects your estimates become much more reliable.
- Add a buffer. A buffer of 10-20% of the hours covers the normal amount of revision rounds that you include in the contract.
- Multiply hours by your rate and round the total to a clean number.
- Divide by the area to get your per-square-metre benchmark, and compare it with earlier projects.
Example: the hourly rate
All numbers below are an illustration, not a market benchmark. Use your own costs.
- Owner pay: 48,000 EUR per year
- Studio overhead: 18,000 EUR per year
- Profit margin: 15% on top, so the target is 75,900 EUR
- Working time: 46 weeks x 40 hours = 1,840 hours, of which 55% are billable = about 1,012 hours
- Cost per billable hour: 75,900 / 1,012 = 75 EUR
Example: a fixed fee for a 70 m² apartment
| Stage | Hours | Fee at 75 EUR/h |
|---|---|---|
| Brief and survey | 12 | 900 EUR |
| Layout | 24 | 1,800 EUR |
| Concept and visuals | 40 | 3,000 EUR |
| Technical drawings | 50 | 3,750 EUR |
| Specification and estimate | 36 | 2,700 EUR |
| Procurement support | 30 | 2,250 EUR |
| Site visits | 28 | 2,100 EUR |
| Buffer for revisions (15%) | 33 | 2,475 EUR |
| Total | 253 | 18,975 EUR, quoted as 19,000 EUR |
Divided by 70 m², the benchmark is about 271 EUR per m². Next time a client with a similar apartment asks for a quick figure, you have a tested number. If the new project has custom joinery or several bathrooms, raise the rate instead of reusing it blindly.
Define the scope so the price holds
A fixed fee fails when the scope is vague. Most losses come from revision rounds, extra rooms and site visits that nobody counted. Write these limits into the proposal before the client signs.
Scope checklist
- Exact area and rooms included, with a note on what happens if the area changes
- List of deliverables: layouts, visuals, drawings, specification, estimate
- Number of revision rounds per stage, and what counts as one round
- Number of site visits included and the price of each additional visit
- Whether procurement support is included, and for which categories
- Who pays for travel, printing, samples and courier costs
- Hourly rate for work outside the contract
- What the client must provide, and by when (decisions, access, documents)
- What happens if the project pauses for more than a set number of weeks
Handle changes in writing
When the client asks for something outside the scope, name the extra cost before you start: the hours, the rate and the effect on the deadline. A short written confirmation is enough. This keeps the conversation about the project, not about trust.
Schedule payments and separate design fees from purchases
Tie each payment to a result the client can see. A common split is 30% on signing, 30% on concept approval, 30% on technical drawings and 10% on handover of the procurement package. The first payment should cover the cost of starting, so you never work on a project that has not begun financially.
Decide early how you earn on purchases. Some studios charge only a design fee, and the client pays suppliers directly. Others add a markup, receive a share of the supplier discount, or take a commission. Whatever you choose, keep this income visible as a separate line and explain it in the contract. If you use markup, the markup calculator helps you check how a percentage turns into the client price and your profit. A project finance view then shows how the design fee and the purchase income add up. See also project finance.
How to do it in ArchiBoard
Once the price is agreed, you can track the fee and your income in one project. The plans and their limits are on the pricing page; the Free plan allows up to 20 items and 2 participants. The first steps are described in the Getting Started chapter.
- On the home page click "New Project" and enter the name, the city and your studio's role in the project.
- Open the project and go to "Project Finances". In the finance settings specify how you earn (commission, markup or share of supplier discount), who pays whom ("Client → Supplier" or "Client → Studio → Supplier"), the project currency and the approved budget.
- Go to "Estimates" and add your design fee as a separate line. A studio fee has its own status chain: Needs approval → Approved → Invoiced to client → Partially paid → Paid by client. It has no supplier, so no supplier tasks are created for it.
- When the fee is approved, the task to invoice the client appears. It closes itself when the status becomes "Invoiced to client" or later.
- Record client payments in "Project Finances" as transactions. From a payment you can generate a PDF invoice to the client; your studio details are taken from the profile settings.
- Switch the estimate to "Economics" mode to see markup and profit. For the client, use "Export to PDF": internal figures such as purchase price, markup and profit are not included.
FAQ
Which pricing model is best for a new studio?
Start with a fixed fee built from your own hour estimates, and use hourly billing for extra work. A new studio has no history, so track time on every project. After a few projects you will know your real hours per stage and can quote with much more confidence.
How do I choose a price per square metre?
Do not pick it from competitors. Calculate a fixed fee from hours on a few finished projects, divide each by its area, and compare the results. Use separate rates for service levels such as concept only, full design, or full design with supervision. Treat the figure as a quick estimate, not as a final price.
Should I show my hourly rate to clients?
Show it when you bill hourly work or extra work outside the contract. For a fixed fee, the client needs the total, the deliverables and the payment schedule. The hours and the rate are your internal tool, but you can share the stage breakdown to explain why the price is what it is.
How many revision rounds should a fixed fee include?
Two rounds per stage is a common starting point, but the right number is the one you included in your hour buffer. Define what counts as a round: a set of comments sent together. State clearly that further rounds are billed hourly, so the client can decide knowingly.
What if the project scope grows after signing?
Pause and quantify the change: extra hours, rate, and effect on the deadline. Send it to the client in writing and start only after confirmation. If the change is large, issue an addendum to the contract with a new fee and a revised payment schedule.