Furniture Delivery Inspection Checklist: Accept Goods on Site
· 7 min read
A furniture delivery inspection checklist lets you accept goods on site in a fixed order: check the packaging before you sign, match every item to the specification, open and test it, then record the result with photos. Do these checks while the carrier is still present, because damage and shortages are easiest to prove at that moment. The steps below work for a single sofa and for a full-house delivery.
Prepare before the truck arrives
Most acceptance problems start the day before, not at the door. A receiver who has the specification in hand and a clear route to the room can check calmly. A receiver who improvises usually signs first and looks later.
- Open the specification for this delivery: item name, SKU, colour or finish, dimensions and quantity, grouped by room.
- Confirm the date and time window with the supplier or carrier one or two days ahead. Ask how many packages to expect and whether carry-in and assembly are included.
- Name one person who accepts the goods and has the authority to sign. Two people sharing this role often means nobody does it properly.
- Prepare the site: book the lift, clear the route, protect floors and door frames, and free a dry area large enough to open the largest package.
- Pack your tools: tape measure, phone with a working camera, utility knife, flashlight, marker, gloves and a printed acceptance form or notepad.
- Agree with the supplier that the carrier waits while you open the packages. If the carrier refuses, you will need the fallback in the section on recording discrepancies.
The on-site furniture delivery inspection checklist
Work in the same order for every delivery. Start with the outside of the package, then identification, then the product itself. The table shows what to check and what evidence to keep.
| Stage | What to check | Evidence to keep |
|---|---|---|
| Outside packaging | Dents, torn corners, wet spots, broken straps, signs of impact | Photo of each damaged side before opening |
| Package count | Number of packages against the delivery note and the order | Photo of all packages together |
| Identification | Label, SKU, model, colour code, batch number on the package | Close-up photo of the label |
| Product surface | Scratches, chips, stains, colour or grain differences between parts | Photos in daylight, with a coin or tape measure for scale |
| Dimensions | Width, depth and height against the specification | Photo of the tape measure on the item |
| Function and completeness | Doors, drawers, mechanisms, hardware, glass, lamps, fabric swatches | Short video of moving parts |
Packaging and transit damage
- Walk around every package before the carrier hands over a paper to sign.
- Photograph visible damage from two distances: the whole package and a close-up.
- If the package is damaged, say so to the carrier immediately and write it on the delivery paper.
- Check the package count even if everything looks fine. A missing box is the most common hidden problem in a multi-piece order.
Identification and specification match
- Compare the label with the specification: SKU, colour, size, material, quantity.
- For fabrics and finishes, compare against the approved sample, not against memory.
- For sets (chairs, bedside tables, lamps), check that every piece has the same colour batch.
- Check the left or right orientation on corner sofas, kitchen modules and doors.
Condition and function
- Unpack enough to see all visible surfaces, including the back and underside.
- Measure the main dimensions and compare them with the specification and with the opening the item must pass through.
- Open and close every door and drawer; check hinges, slides and gaps.
- Check that fixing hardware, legs, shelves, mounting plates and instructions are in the box.
- For lighting, check the cable length, the plug type and the included bulbs or drivers.
Record discrepancies and sign correctly
A signature normally means you accepted the goods as delivered. Write exactly what you found before you sign, and keep the wording factual.
- Stop unloading further items from the same group until you have decided what to do with the problem one.
- Photograph the issue, the label and the whole item, in that order.
- Write a short note on the delivery paper: item, SKU, what is wrong, where. For example: "Sofa, SKU 1182: scratch on left leg, 8 cm; box corner crushed."
- Ask the carrier to countersign the note. If they refuse, write "carrier refused to sign" and photograph the paper.
- Send the supplier a written summary with photos on the same day, using email or a messenger so there is a timestamp.
- Agree the next step in writing: replacement, repair, partial credit or return. Check your supply contract for the period in which claims must be filed.
Decision table
| Finding | Typical decision | What to write |
|---|---|---|
| Everything matches, no damage | Accept | Accepted, date, receiver name |
| Minor cosmetic defect that can be repaired on site | Accept with a note | Defect description and agreed repair |
| Wrong colour, size or model | Do not accept the item | Expected versus delivered, with SKU |
| Structural damage or broken glass | Do not accept the item | Damage description, photos, carrier remark |
| Missing package or part | Accept the rest, record the shortage | Missing item, package count expected versus received |
| Concealed damage found after unpacking later | Report immediately | Date found, photos, link to the delivery record |
After acceptance: close the loop
Acceptance is not finished when the truck leaves. The result drives payment, installation and the client conversation.
Example (illustrative numbers): a sofa costs 2,400 EUR, and 50% was paid as an advance. It arrives with a scratched leg. If you accept it with a written note and the supplier agrees to replace the leg, you can schedule the remaining 1,200 EUR payment after the repair. If you accept silently, you have less leverage for that balance.
- Mark the item as accepted or as a discrepancy in your working document the same day.
- Hold the remaining supplier payment until a discrepancy is solved, if your contract allows it.
- Store accepted goods in a dry, protected place with the packaging kept until installation is finished.
- Tell the installer or contractor which items are cleared for installation and which are not.
- Note the supplier's behaviour: late delivery, wrong items and slow replies. This informs your next purchase order.
How to do it in ArchiBoard
The acceptance step sits inside the procurement timeline, so the delivery date, the on-site check and the next tasks stay linked to each estimate item.
- In the project settings, specify who accepts deliveries on site. Automatic tasks go to this person.
- In Estimates, open the item row, then "Vendor & payment" → "Dates: delivery and installation". If the supplier moves the date, change the planned date and choose a "Reason for reschedule".
- When the item has the status "Delivered", the responsible person gets a task to accept it on site. Task rules are described in the tasks chapter.
- On site, click "Acceptance" in the item row. In the "Inspection" section, check the SKU, colour, dimensions and quantity, and attach "Delivery notes" and "Photo report".
- Optionally, use "AI label check": photograph the label, and the system reads the codes and EAN and compares them with the estimate item.
- Choose the result, "Accepted" or "Discrepancy", and write a comment. The comment helps when you send a claim to the supplier.
Acceptance photos are placed in the project Files automatically. If the client should see them, tick "Acceptance photos" in the visibility settings of the client portal; by default the client does not see them.
FAQ
Should I open every box before signing?
Open as much as is needed to see all visible surfaces and confirm the contents. For large orders, check every package count and label first, then unpack fully the items with the highest value or damage risk, such as glass, stone and upholstered pieces. Record in writing which packages you did not open.
What if the carrier will not wait while I inspect?
Photograph the packages and the label, check the package count, and write "inspection not completed, carrier did not wait" on the delivery paper before you sign. Then unpack the same day and send the findings to the supplier in writing. This keeps your claim possible, though it is weaker than a countersigned note.
Who should accept the delivery: the designer or the client?
Whoever knows the specification best and has the authority to sign. In most projects this is the designer or a procurement manager, not the client. If the client is present, ask them not to sign anything themselves, and agree beforehand who speaks to the carrier.
What do I do with damage found after the carrier has left?
Stop unpacking, photograph the damage and the packaging, and notify the supplier in writing the same day. Refer to the delivery record and state when you discovered the problem. Check your contract for the claim period, because hidden damage is accepted more easily when it is reported quickly.
Which photos are enough for a claim?
Keep four types: the whole package, the label, the damaged area in close-up, and the complete item showing where the damage is. Add a photo of the delivery paper with your note. Use daylight, avoid editing, and keep the original files with their timestamps.